Project Scope: Install Express Underground Feeder
We abandoned the old feeder and removed the pole, wire and switch that fed it. We also installed a new underground feeder termination with 500 MCM copper cable, to be operated at 34.5kv.
Project Scope: Directional drill/ Trench
View Project