Project Scope: Install Express Underground Feeder

Constructed new express underground 34.5kv feeder. Behind the substation, installed a single phase underground termination and 1/0 cable to intercept current cable and spliced in a new feed.

We abandoned the old feeder and removed the pole, wire and switch that fed it. We also installed a new underground feeder termination with 500 MCM copper cable, to be operated at 34.5kv.

 