Agate Pass Tower Replacement

Back to Service
Project Details

Project Scope: Replacement of steel lattice towers

Replaced two existing steel lattice towers supporting two 115kv transmission lines crossing over the Agate Pass Waterway.

Set new steel poles and reconductor. Replaced towers with four steel poles, two on each side of Agate pass – Kitsap County side of the crossing replaced by two 130-foot tall steel poles; Bainbridge side replaced by two 140-foot tall steel poles.

 

Related Projects

June 2024
Baker-Shannon 115kV Upgrade

This project, aimed at mitigating fire risks, involved replacing 38 structures or a total of 94 poles, stretching over 8.5 miles.