Rail Center Work

Back to Service

Potelco’s Major Project Division has sub-contracted to provide the materials and labor for rebuilding the overhead system within and adjacent to this facility.

The contract includes 1.5 miles of new 4/0 grooved trolley wire, over 2 miles of 3/8″ steel strand, including, ancillary support fittings, 1/3 mile of 500 kcmil feeder cable and 15 1200 Amp, 1000 Volt DC Disconnect Switches, while keeping the facility in full operation.

 