Cle Elum Upper Peoh Feeder

Back to Service
Project Details

Client: Puget Sound Energy

Project Scope: 34kv Job

Installed 25 poles, pulled approximately 6,000 feet of 397 double circuit wire in the Cle Elum area.

The crews installed two 600 amp, gang operated switches during this project. This project was designed to connect two circuits creating more reliability in the infrastructure.

 