Substation Construction

Project Scope: Constructed 10 Acre Substation

Potelco constructed a 10 acre substation site. The complete civil construction included drainage, foundations, rock work, street lights, roadway improvements, and containment of the area. Constructing this substation also included the electrical assembly, transformer installation, control house, metal clad switchgear, 115kv ring bus, SF-6 gas breakers, control cabling, capacitor bank, terminations and electrical testing. Our team was able to execute this project from the ground up with a level dedication to safety and professionalism.